Greenstar Enviro Solutions
Greenstar Enviro Solutions
Indore, Madhya Pradesh
GST No. 23EEIPP1517P1Z5
TrustSEAL Verified
Call 08044560241 82% Response Rate
SEND EMAIL

Environmental Consultancy Services

Our range of products include environmental compliance service, pollution control board license, borewell noc from central ground water authority (cgwa), environmental clearance service, etp operation maintenance service and environmental technical service.

Environmental Compliance Service

Environmental Compliance Service
  • Environmental Compliance Service
Get Best Quote
Approx. Price: Rs 10,000 / ProjectGet Latest Price
Product Brochure
Ensure your business meets environmental regulations with our comprehensive compliance services, including audits, reporting, and sustainable solutions. Expert guidance to achieve eco-friendly operations seamlessly.
Request
Callback
Yes! I am Interested

Pollution Control Board License

Pollution Control Board License
  • Pollution Control Board License
  • Pollution Control Board License
  • Pollution Control Board License
  • Pollution Control Board License
Get Best Quote
Approx. Price: Rs 20,000 / CertificateGet Latest Price
Product Brochure

Product Details:

Service Location/CityIndore, Bhopal, Dewas, Pithampur, Dhar, Madhya Pradesh, Gujarat
DepartmentMadhya Pradesh Pollution Control Board (MPPCB), GPCB, RSPCB
NOCCTE/CTO
Type of applicationOnline
NOC required Timing1 Month

The State Pollution Control Board (SPCB) NOC (No Objection Certificate) is a crucial regulatory requirement for businesses and industries operating in Madhya Pradesh. It ensures that the proposed activities comply with environmental standards and do not harm the environment. Here’s a detailed look at the process and importance of obtaining an SPCB NOC:

Importance of SPCB NOC
  1. Regulatory Compliance: Ensures adherence to environmental regulations, helping businesses avoid legal penalties.
  2. Environmental Protection: Guarantees that the business operations will not adversely affect the environment.
  3. Public Health: Protects the health of the local population by controlling pollution levels.
  4. Sustainable Development: Promotes eco-friendly industrial practices, contributing to sustainable development.
Types of NOCs
  1. Consent to Establish (CTE): Required before the commencement of any industrial activity. It ensures that the proposed project meets all the necessary environmental standards.
  2. Consent to Operate (CTO): Required after the establishment of the industry to begin operations. It is periodically renewed based on compliance with environmental norms.
Process for Obtaining SPCB NOC
  1. Application Submission: Submit an application along with required documents such as project report, site plan, and details of pollution control measures.
  2. Site Inspection: MPPCB officials conduct a site inspection to verify the details provided and assess the environmental impact.
  3. Review and Approval: The board reviews the application and inspection report. If the project complies with environmental norms, the NOC is granted.
  4. Implementation of Measures: Ensure the implementation of suggested pollution control measures.
  5. Monitoring and Renewal: Regular monitoring by SPCB and timely renewal of NOC to ensure continuous compliance.
Request
Callback
Yes! I am Interested

Borewell NOC from Central Ground Water Authority (CGWA)

Borewell NOC from Central Ground Water Authority (CGWA)
  • Borewell NOC from Central Ground Water Authority (CGWA)
  • Borewell NOC from Central Ground Water Authority (CGWA)
  • Borewell NOC from Central Ground Water Authority (CGWA)
  • Borewell NOC from Central Ground Water Authority (CGWA)
Get Best Quote
Approx. Price: Rs 50,000 / PieceGet Latest Price
Product Brochure

Product Details:

Application typeOnline
BoardCGWA
AreaMP, CG, GJ, RJ
forBorewell
DepartmentCGWB

To obtain a No Objection Certificate (NOC) from the Central Ground Water Authority (CGWA) for a borewell, you need to follow specific procedures and meet certain criteria. The process can vary depending on the purpose of the borewell (e.g., domestic, agricultural, industrial) and the location. Here are the general steps to apply for a Borewell NOC from the CGWA:

Steps to Apply for Borewell NOC:
  1. Check Applicability:

    • Confirm if your area is notified or non-notified by CGWA. NOCs are typically required for notified areas where groundwater extraction is regulated.
  2. Prepare Necessary Documents:

    • Ownership Proof: Land ownership or lease documents.
    • Water Requirement: Detailed water requirement for the intended use.
    • Groundwater Availability: Hydrogeological report and groundwater availability assessment.
    • Site Plan: Location and layout plan of the borewell site.
    • Rainwater Harvesting: Plan and commitment to implement rainwater harvesting if required.
    • Consent to Establish: From State Pollution Control Board if applicable.
  3. Online Application:

    • Visit the CGWA website or the State Ground Water Authority’s website.
    • Register and log in to the online application portal.
    • Fill out the application form with all required details.
    • Upload scanned copies of all necessary documents.
  4. Pay Application Fee:

    • Pay the required application fee online as specified by the CGWA.
  5. Submit Application:

    • Review and submit the completed application online.
  6. Inspection and Verification:

    • The CGWA or State Ground Water Authority may conduct a site inspection to verify the details provided.
  7. Approval Process:

    • If the application and inspection reports are satisfactory, the CGWA will issue the NOC.
    • The NOC will specify conditions for groundwater extraction and other compliance requirements.
  8. Follow-up:

    • Ensure compliance with the conditions mentioned in the NOC.
    • Maintain records of groundwater usage and any required monitoring reports.
Important Points:
  • Rainwater Harvesting: For many applications, especially in notified areas, implementing a rainwater harvesting system is mandatory.
  • Validity and Renewal: The NOC is generally valid for a specified period (often 2-3 years). Ensure you apply for renewal before the expiry date if continued use is needed.
  • Compliance: Regularly monitor and report groundwater usage as per the conditions in the NOC.
Request
Callback
Yes! I am Interested

Environmental Clearance Service

Environmental Clearance Service
  • Environmental Clearance Service
  • Environmental Clearance Service
  • Environmental Clearance Service
Get Best Quote
Approx. Price: Rs 50,000 / ProjectGet Latest Price
Product Brochure

Product Details:

Preferred LocationIndia
Service Duration5 Day
Payment ModeOnline/Offline
Mode Of ServiceOffline
Departmentmoefcc,SEIAA,SEAC

In pursuant to the provisions of Environment Impact Assessment Notification, 2006 and subsequent amendments, issued under Environment (Protection) Act, 1986, following Projects/Activities as listed in the schedule to this notification shall require prior environment clearance from the concerned regulatory authority before commencing any construction work.
Request
Callback
Yes! I am Interested

ETP Operation Maintenance Service

ETP Operation Maintenance Service
  • ETP Operation Maintenance Service
  • ETP Operation Maintenance Service
  • ETP Operation Maintenance Service
Ask For Price
Product Price :Get Latest Price
Product Brochure
Service Location madhya pradesh
color blue and green in color
piping UPVC and CPVC
Motors kirlosker and other brands
Capacity 50 KLD
Request
Callback
Yes! I am Interested

Environmental Technical Service

Environmental Technical Service
  • Environmental Technical Service
  • Environmental Technical Service
  • Environmental Technical Service
Get Best Quote
Approx. Price: Rs 50,000 / ProjectGet Latest Price
Product Brochure

Product Details:

NOCCTE/CTE/CGWA/EPR/FIRE
BoardMPPCB/CPCB/GPCB/MOEFCC/CGWA
Application TypeOnline
PaymentOnline
Type of workConsultancy

Dear Sir,

Greetings from GreenStar Enviro Solutions!

We offer a comprehensive range of environmental services, including obtaining NOCs from pollution Control Board and Environmental Clearances, EPR Registration from CPCB, Carbon Footprint Assessments, Pollution Control System design and installation (STP/ETP/ZLD/APCM), Commercial/Industrial RO plant manufacturing and installation, Fire NOCs, Environmental Audits, Rainwater Harvesting systems, Annual Return filing, and ensuring compliance with environmental regulations. Please feel free to contact us for any environmental-related needs. /हम पर्यावरणीय सेवाओं की एक विस्तृत श्रृंखला प्रदान करते हैं, जिसमें प्रदूषण नियंत्रण बोर्ड (MPPCB) से एनओसी प्राप्त करना और पर्यावरण मंजूरी (EC), सीपीसीबी ईपीआर(EPR) रजिस्ट्रेशन, कार्बन फुटप्रिंट आकलन, वाटर/वेस्ट वॉटर ट्रीटमेंट प्लांट डिजाइन और स्थापना (एसटीपी/ईटीपी/जेडएलडी/एपीसीएम) वाणिज्यिक/औद्योगिक आरओ प्लांट निर्माण और स्थापना, फायर एनओसी, वर्षा जल संचयन प्रणाली, पर्यावरण ऑडिट, और पर्यावरणीय नियमों का अनुपालन सुनिश्चित करना शामिल है। कृपया पर्यावरण संबंधी किसी भी आवश्यकता के लिए बेझिझक हमसे संपर्क करें।

Request
Callback
Yes! I am Interested
X

Product Videos

Sewage Treatment Plant

Sewage Treatment Plant

Get Best Quote

Explore More Products

View All Products
Tell Us What Are You Looking For ?




Reach Us
Sachin Patidar (Proprietor)
Greenstar Enviro Solutions
Second Floor, 203, Shanti Corporate Plot No 116, Sapna Sangeeta Road, Sneh Nagar
Indore - 452001, Madhya Pradesh, India
Get Directions

Call Us


Send E-mail