Greenstar Enviro Solutions
Greenstar Enviro Solutions
Indore, Madhya Pradesh
GST No. 23EEIPP1517P1Z5
TrustSEAL Verified
Call 08044560241 82% Response Rate
SEND EMAIL

Rainwater Harvesting Service

Offering you a complete choice of products which include central ground water board services.

Central Ground Water Board Services

Central Ground Water Board Services
  • Central Ground Water Board Services
  • Central Ground Water Board Services
  • Central Ground Water Board Services
  • Central Ground Water Board Services
Get Best Quote
Approx. Price: Rs 75,000 / ProjectGet Latest Price
Product Brochure

Product Details:

BoardCGWA
ForBorewell
Mode of ApplicationOnline
Validity3 Year
Payment Mode to CGWAvia NOCAP portal

The CGWA (Central Ground Water Authority) NOC (No Objection Certificate) is a mandatory approval required for the extraction of groundwater in India. This certificate is primarily aimed at regulating and controlling groundwater extraction to ensure sustainable use and prevent over-exploitation, especially in areas identified as critical or over-exploited.

Here is a detailed overview of the process and requirements for obtaining a CGWA NOC:

Eligibility
  1. Industries: All industries that intend to extract groundwater need an NOC.
  2. Infrastructure Projects: Construction projects, commercial complexes, and other infrastructure projects requiring groundwater extraction.
  3. Mining Projects: Mining operations needing groundwater extraction.
  4. Agriculture: Large-scale agricultural operations, particularly those in notified areas, may also require an NOC.
Categories of Areas
  • Notified Areas: Areas where groundwater levels are critically low and extraction is highly regulated.
  • Non-Notified Areas: Areas where groundwater extraction is less restricted but still requires regulation.
Application Process
  1. Application Submission: Applications must be submitted online through the CGWA's official website.
  2. Supporting Documents: Required documents generally include:
    • Project report
    • Hydrogeological report
    • Consent from the State Pollution Control Board
    • Proof of land ownership/lease
    • Details of existing groundwater extraction infrastructure
  3. Processing Fee: Payment of a fee as per the CGWA guidelines.
Assessment
  • Site Inspection: A site inspection may be conducted by CGWA officials to assess the feasibility and impact of the proposed groundwater extraction.
  • Impact Assessment: An environmental impact assessment (EIA) might be required for large-scale projects.
Conditions
  • Water Conservation Measures: Implementation of rainwater harvesting and other water conservation methods.
  • Monitoring: Regular monitoring of groundwater levels and quality, with periodic reporting to the CGWA.
  • Renewal: NOCs are typically issued for a specified period and need to be renewed periodically.
Compliance and Penalties
  • Non-compliance with the terms and conditions of the NOC can result in penalties, including the revocation of the NOC and legal action.
Request
Callback
Yes! I am Interested
X

Product Videos

Sewage Treatment Plant

Sewage Treatment Plant

Get Best Quote

Explore More Products

View All Products
Tell Us What Are You Looking For ?




Reach Us
Sachin Patidar (Proprietor)
Greenstar Enviro Solutions
Second Floor, 203, Shanti Corporate Plot No 116, Sapna Sangeeta Road, Sneh Nagar
Indore - 452001, Madhya Pradesh, India
Get Directions

Call Us


Send E-mail